Showing posts with label leader head. Show all posts
Showing posts with label leader head. Show all posts

Sunday, November 13, 2011





Azek beadboard is installed and very nice to work with. Crown was also replaced. Now I'll need to add a downspout. I'd like to do copper, but may think twice when I get it priced. I'll need 20' of it. Or I may go galvanized for the downspout and possibly add a leader head so the copper wont have any galvanic reaction to the galvanized-but the leader head may be pricey also. Hmmm. I'm going to order new storm windows for this side of the house-hoping they wont cost too much.